Forum Europejskie Centrum Integracji i Rozwoju Strona Główna Europejskie Centrum Integracji i Rozwoju
ECID WITA


observe the lighting is working properly LED

 
Napisz nowy temat   Odpowiedz do tematu    Forum Europejskie Centrum Integracji i Rozwoju Strona Główna -> Ogólne
Zobacz poprzedni temat :: Zobacz następny temat  
zkl395m1g




Dołączył: 01 Kwi 2011
Posty: 5
Przeczytał: 0 tematów

Ostrzeżeń: 0/5
Skąd: England

 PostWysłany: Sob 3:38, 02 Kwi 2011    Temat postu: observe the lighting is working properly LED Back to top

In case of light damage to the thermal deformation of materials and abnormal phenomenon is the experiment failed. B: the impact of high temperature and pressure start test. Major test equipment: incubators,LED neon sign, thermometers, voltage regulator, voltmeter and clock. Main test items: high-temperature startup performance and reliability testing quantity: 10. Test Method: Plug trials. At high temperatures, the regulator voltage to 250V, switch three times, at intervals of not less than 8 seconds (an interval of 8 seconds is to be the capacitance of all the discharge lamps to reduce the mutual interference),LED sign, in the process , lamps should not be damaged, or they will be disqualified. C: low temperature. Main Test Equipment:
Cold boxes, thermometers, voltage regulator, voltmeter and clock. Main test items: low temperature and pressure to start. The number of tests: 10. Test Method: tested lamps into the cold chamber, the connection circuit, the voltage regulator's output voltage to 180V (voltage regulator power supply only to the lamp under test), open the cold box power supply, the temperature set at -15 ��, to be inside the box again when the temperature dropped to -15 �� for 2 hours so the lamps to cool, turn on the lamp power supply, observe the results.
In case of light damage, and abnormal phenomena can not be started while the experiment failed. (Bell brand of constant temperature and humidity box BE-TH Series) D: low-temperature high-pressure shock launch test. Main Test Equipment: Cold boxes, thermometers, voltage regulator, voltmeter and clock. Main test items: the number of low-temperature high-pressure shock reliability tests: 10.
Test Method: Plug trials. In the low-temperature conditions, the regulator voltage to 250V, switch three times,LED open sign, at intervals of not less than 8 seconds (an interval of 8 seconds is to be the capacitance of all the discharge lamps to reduce the mutual interference), in the process , lamps should not be damaged,LED display board, or they will be disqualified. E: vibration test. Main testing equipment: vibration test stand a number of tests: 10 packaging.


Post został pochwalony 0 razy
 
Zobacz profil autora
Wyświetl posty z ostatnich:   
Napisz nowy temat   Odpowiedz do tematu    Forum Europejskie Centrum Integracji i Rozwoju Strona Główna -> Ogólne Wszystkie czasy w strefie EET (Europa)
Strona 1 z 1

 
Skocz do:  
Możesz pisać nowe tematy
Możesz odpowiadać w tematach
Nie możesz zmieniać swoich postów
Nie możesz usuwać swoich postów
Nie możesz głosować w ankietach

Cobalt 2.0 phpBB theme/template by Jakob Persson.
Copyright © 2002-2004 Jakob Persson


fora.pl - załóż własne forum dyskusyjne za darmo
Powered by phpBB © 2001, 2002 phpBB Group