Forum Europejskie Centrum Integracji i Rozwoju Strona Główna Europejskie Centrum Integracji i Rozwoju
ECID WITA


air jordan shoes cheap LonWorks technology in the

 
Napisz nowy temat   Odpowiedz do tematu    Forum Europejskie Centrum Integracji i Rozwoju Strona Główna -> Ogólne
Zobacz poprzedni temat :: Zobacz następny temat  
lojmikak




Dołączył: 30 Sie 2010
Posty: 1597
Przeczytał: 0 tematów

Ostrzeżeń: 0/5
Skąd: olvovw

 PostWysłany: Wto 16:51, 21 Gru 2010    Temat postu: air jordan shoes cheap LonWorks technology in the Back to top

LonWorks technology in the control of the heating system


s, communication distance up to 2700m, to fully meet the communication requirements of the control signal, without using repeaters to extend communication distance. Five Quarters heating control system shown in Figure 3. One by one one by one back to back 84 of 17 QINGDAO hot water back to the water volume V in Figure 3 quarters Heating Control System Figure 3 is a five dormitory heating system diagram. There are four five dormitory quarters. Hot water at each entrance of buildings on an electric control valve installation, installation of a backwater export thermal resistance sensor. 4 RTD temperature signal in the sensor nodes into a standard analog signal first, and then generate digital signal sampling, in accordance with the LonTalk protocol package output. The modulated signal transmitted through telephone lines to the boiler control room. Demodulated signal and then through the MODEM, serial network adapter into the ATM network. Points detected from the ATM network console each block building return water temperature signal, the PID operation have to import and export of the valve opening control signal. The signal into the ATM network, the serial network adapters and modems, through the modulation control signal through telephone lines back to five quarters, and then demodulated by the modem, to another node. In this node, the LonTalk protocol in accordance with the reassembled packets to analog control signals, sent to the electric control valve, control valve opening,[link widoczny dla zalogowanych], at any time adjust the water flow. This system ensures that each block of F return water temperature measured basic equal to the given temperature. If the floor of the return water temperature is below a given temperature, return water temperature measured through the field nodes, MO-DEM, phone lines, serial communication adapter,[link widoczny dla zalogowanych], ATM network into the computer, through computer control algorithms, the output control signal, and then After another ATM network, serial communication adapter, telephone line, MODEM, electric actuator to reach the scene node, transfer large hot water valve opening, and finally to return water temperatures rise. When the return water temperature is higher than a given value,[link widoczny dla zalogowanych], the control signal is off a small hot water valve. Thus, the control system to ensure that the return water temperature of each Block F are consistent with the given value,[link widoczny dla zalogowanych], there would be no significant difference in dorm room was. The control system of a dormitory with five quarters like, do not repeat them here. In engineering practice, the more mature products are the United States Echelon LonWorks (Echelon) the company's LonPoint systems, electronic information industry, the Ministry of R & D centers in six LCN-N systems, and building automation Chongqing Sichuan Instrument Company for a 2000 system for ART Select References: [1] East China Architectural Design Institute. Intelligent Building Design Technology [M]. Shanghai: Tongji University Press, 1996. [2] Li. Intelligent building system engineering [M]. Beijing: Electronic Industry Press, 1998. 3 Wei,[link widoczny dla zalogowanych], et al: IrODw. rks in the heating system control Ken 85THEAPPLYOFLONWORKSTECHNOLOGYONHEATINGSYSTEMCONTROLLIWei, LIQuanmin (ShandongInstituteofArchitectureandEngineering, Dept.. fInf0rmati. n & Electrica1Engineering, ji'nan250014, China) Abstract: Torealizetheautomationcontrolover-the. hLeaatningstyrsatnemiotndliarigtael-sisgcnaalels, adecpoenntrdoeldp. ronj. e1cttswchasarpaucttefroirs-a diwar, nwhichLonWorkstechnologywasusedandLantotransmQga. g spit uc children ... ... ... ~, ticsarethat, Lanusesstructure. ffreetopoi. gY. thecablingissimplicity, anditcanconnectwithmanytarheatingstati. nyphonewire, andachieVethec. ntrolc. vering1arge-extent �� Keywords: intelligentbuilding; aut. maticc. ntrol; b. iler; 1. nWorks; Heatingsystem

相关的主题文章:


[link widoczny dla zalogowanych]

[link widoczny dla zalogowanych]

[link widoczny dla zalogowanych]


Post został pochwalony 0 razy
 
Zobacz profil autora
Wyświetl posty z ostatnich:   
Napisz nowy temat   Odpowiedz do tematu    Forum Europejskie Centrum Integracji i Rozwoju Strona Główna -> Ogólne Wszystkie czasy w strefie EET (Europa)
Strona 1 z 1

 
Skocz do:  
Możesz pisać nowe tematy
Możesz odpowiadać w tematach
Nie możesz zmieniać swoich postów
Nie możesz usuwać swoich postów
Nie możesz głosować w ankietach

Cobalt 2.0 phpBB theme/template by Jakob Persson.
Copyright © 2002-2004 Jakob Persson


fora.pl - załóż własne forum dyskusyjne za darmo
Powered by phpBB © 2001, 2002 phpBB Group